Stairwell and 2 pc bath addition

Lots of work being done to get us closer to moving back in. The last week has seen the most progress on the north side of the house. 

We are adding a small addition that allows the stairwell to be one straight run. Previously the stairs turned and there wasn't enough ceiling clearance. The original plans called for a closet, but we changed it to a powder room (2 piece bath with sink + toilet).

The bathroom will be off of this bedroom. This is a "before" picture. That door was a closet and will be moved to become the bathroom to the left. Those windows will be removed and a window added to the west side and in the bathroom. 

Doorway of the west basement bedroom

Egress window 

How we get into the basement right now. 😆


South bedroom


Loose dirt, debris, and concrete chunks need to be removed before the flat concrete can be done. 


Floor for bathroom


Elliott lost a tooth on Monday!

Framing for the stairwell and bathroom


It was dark when we got home. But lots of progress! Roof rafters and walls done. The hole for the bathroom window is there, too!

The doorway to the left was the closet. Bathroom straight ahead. Stairwell will be below. 

These windows and doorway will be closed up and this will be a wall with the bathroom door on the left.