Posts

Basement updates, rubble pile gone, lost power, framing - February through April 2025

Image
Since the last update in January, we've continued to work on basement framing and insulated during our limited free time. Between work, homeschooling, and other activities, there isn't always a free day to make dents in the project, but we're chipping away at it.  In late February, we got a new-to-us truck, which has been very useful in doing house projects! We got a load of lumber and insulation at Menards. In March, we loaded rubble from our rubble pile to take to the dump. We quickly realized (even though we already knew) that the pile was much too large for us to tackle on our own with the equipment we have.  We made some inquiries and got ahold of a company out of Lincoln. He came out the same day and gave us an estimate, and he got started soon after hauling the concrete and rebar for disposal. It was quite the process to watch, and we are so glad the debris is gone from our yard! On March 19th, we got some high winds, rain, and snow and we lost power for over 60 hour...

Basement framing and insulation

Image
The last few weekends, we have been continuing to work on framing and insulating the basement.   We had to add some blocking in order to attach the top sill plate. This is the larger bedroom on the southeast side of the basement.  Looking out the closet doors. This will be part of the bedroom closet and a linen closet. Bathroom where the vanity and toilet will be placed.  We got a little snow! Added furring strips and foam board insulation. Added batt insulation  We bought a table saw to rip 2×4s. Some walls we need to frame with furring strips because of the duct work near the walls.  Work site mascot. Furring strip wall. North side of 2nd bedroom.  We have to finish framing this window wall and few more walls, but we're getting close! After that, we'll insulate and then start on elecrical!