Basement framing and insulation
The last few weekends, we have been continuing to work on framing and insulating the basement. We had to add some blocking in order to attach the top sill plate. This is the larger bedroom on the southeast side of the basement. Looking out the closet doors. This will be part of the bedroom closet and a linen closet. Bathroom where the vanity and toilet will be placed. We got a little snow! Added furring strips and foam board insulation. Added batt insulation We bought a table saw to rip 2×4s. Some walls we need to frame with furring strips because of the duct work near the walls. Work site mascot. Furring strip wall. North side of 2nd bedroom. We have to finish framing this window wall and few more walls, but we're getting close! After that, we'll insulate and then start on elecrical!