Posts

Prepping for concrete

Image
The concrete company is getting ready to pour our porches and basement floor. They delivered several truckloads of gravel and sand on Wednesday. We needed to clear out some of the excess chunks of dirt and loose dirt before they put down sand. Extra chunks were created when they dug the sewer. Before gravel and sand The kids made Gingerbread houses with our friends and neighbors. ❤️ After being filled with gravel and sand They dumped the sand into the basement with a skid loader into the egress window. Then they spread it out.

Plumbing in

Image
The plumbing was installed today! The pictures aren't very good, because it was dark when we got home, but we're very glad things are continuing to progress! We're getting close to getting the concrete floors poured. Also here is Seth going to turn on the water the other day to show the distance:  https://youtu.be/5KoRY8OUc0Y?si=u6mVQ9qDsu2Ze2FI Elliott lost his two front teeth. The most recent one came out on Friday.  June helped shovel out some dirt on Sunday afternoon.  Carrying buckets.  Sump pump Drains for basement bathroom.  Utility room Utility room

Sewer line in!

Image
We don't have much room for making Christmas treats, but the kids and I made caramel popcorn and chocolate dipped pretzels on Tuesday. Also, they dug for the sewer line! That's a big step, so progress is continuing! Also, I held some puppies at our homeschool mom's cookie exchange! ❤️

Coming along

Image
Work is continuing on the structure. We're hoping the sewer contractor will get his work done early next week. After that, they can work on the rest of the plumbing and the concrete work for the basement floor and porches. Then electrical, HVAC, etc! Roof on the additon is done. The shingles we have on the rest of the house were discontinued, so these are slightly darker.  The floor of the porch/roof of the storm shelter.  June painting! Top of the storm shelter. This will be covered with concrete.  This in the front will be a concrete porch like we had before. 

More addition progress

Image
More changes on the outside. The roof is almost done and the Tyvek wrap is on. The windows are a few weeks out, but that won't delay our move back in.  Before the roof paper and Tyvek wrap: